Mane-Hata 8:00-18:00 (GMT+8)
Metal stamping assembly line showing welding and joining operations for stamped components

tā konganuku Drawing Package Completeness Checklist

Short answer: A complete tā konganuku drawing package should include the controlled 2D drawing, 3D model if available, revision level, material grade and thickness, finish, tolerance notes, burr direction, critical features, assembly use, inspection requirements, packaging needs, annual volume, and target timing. Missing data usually turns into quote assumptions, delays, or cost changes after tooling review.

Many quote delays are not caused by kaiwhakarato capacity. They happen because the RFQ package leaves too much for the kaiwhakarato to guess. A tā kaiwhakarato can estimate tooling and unit price faster when the drawing package separates fixed requirements from open decisions.

Use this checklist with the drawing review checklist, quote assumptions checklist, RFQ checklist, and DFM review before tooling guide.

Drawing package fields that reduce quote assumptions

Package item Why it matters What to send
Controlled drawing The 2D drawing is the quote authority for tolerance, revision, and notes. PDF plus native CAD if allowed, revision, release date, and drawing owner.
3D model Formed features and assembly clearances are easier to review in 3D. STEP, Parasolid, or other neutral file tied to the same revision.
Rawa and finish Tooling, burr, springback, corrosion, and price all change with material. Grade, thickness, temper, coating, plating, passivation, or paint requirement.
Kounga scope Inspection cost changes when every feature is treated as critical. Critical-to-function dimensions, datum scheme, gage need, report format, and sample size.

Mark what is fixed and what can be reviewed

A kaiwhakarato can help with manufacturability only when the RFQ shows which requirements are fixed. Koeke rauemi, thickness, finish, assembly interface, and safety-critical dimensions may be locked. Hole size, bend radius, burr side, packaging, or inspection sample size may still be open for DFM review.

If a part has Tōmua kaiwhakarato problems, include the failure history instead of only sending a clean drawing. Burr complaints, late tool changes, mixed revisions, plating stains, or poor flatness tell the kaiwhakarato where to focus review. For risk planning, connect the package to the kaiwhakarato risk matrix and critical dimensions inspection plan.

Keep the file revision trail clear

Do not send a PDF, STEP file, and sample photo if they show different revisions without explanation. The kaiwhakarato may quote the wrong geometry or build tooling to the wrong feature set. If files are mixed because the latest 3D model is not available, state which file controls each decision.

A controlled file list should include file name, revision, date, and whether the file is for quote only, tooling, inspection, or packaging. This is especially useful when purchasing, engineering, and quality each send documents separately.

RFQ details to include

  • 2D drawing, 3D model, sample photos, current kaiwhakarato issue, revision level, release date, and controlled file list.
  • Koeke rauemi, thickness, temper, grain direction if important, finish, coating, plating, and compliance needs.
  • Critical dimensions, datum scheme, burr direction, surface zones, flatness, cosmetic areas, assembly fit, and functional test needs.
  • Expected annual volume, prototype need, launch timing, packaging method, label requirements, delivery destination, and target quote date.
  • Inspection package: first article, dimensional report, material certificate, PPAP or FAI if needed, control plan, and sample approval rule.
  • Open decisions for DFM review, such as bend radius, hole-to-edge distance, deburring, tolerance relaxation, or packaging trial.

How to compare kaiwhakarato answers

A useful answer lists assumptions clearly. It does not hide missing material, finish, tolerance, or volume data inside a price. Ask the kaiwhakarato to show which assumptions affect tooling cost and which affect unit price.

If two suppliers quote very different prices, compare the assumed tooling type, inspection scope, finish, packaging, and annual volume curve before choosing. A cheap quote built on the wrong package will usually become an engineering change later.

Tukuna drawings, file list, material, finish, tolerance, volume, and timing through the whakapā page. Use the RFQ form to request a DFM review when the drawing package is complete enough to discuss tooling.

FAQ

What is a complete drawing package for tā konganuku?

It includes a controlled 2D drawing, 3D model when available, revision, material, thickness, finish, tolerances, critical features, inspection needs, packaging, volume, and timing.

Can a kaiwhakarato quote from only a sample photo?

A rough budget may be possible, but production tooling normally needs a controlled drawing, material and thickness, tolerances, and expected volume.

Why do quotes change after DFM review?

Quotes change when missing requirements are clarified, such as material, finish, tolerance, burr direction, inspection scope, tooling type, or packaging.

What should buyers send if the design is not final?

Tukuna the current files, mark open decisions, explain target function, and ask for DFM assumptions rather than treating the quote as final.

Tonoa He Korero

Name
Please describe your project: material, dimensions, tolerances, annual quantity.
Tikina he KORERO KOREUTU
Scroll to Top