{"id":2340,"date":"2026-07-04T20:44:36","date_gmt":"2026-07-04T12:44:36","guid":{"rendered":"https:\/\/metalstampingparts.ltd\/?page_id=2340"},"modified":"2026-07-04T20:44:36","modified_gmt":"2026-07-04T12:44:36","slug":"stamped-part-containment-label-sorting-evidence-guide","status":"publish","type":"page","link":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/","title":{"rendered":"Stamped Part Containment Label and Sorting Evidence Guide"},"content":{"rendered":"<p><strong>Short answer:<\/strong> Containment labels and sorting evidence matter when stamped parts are inspected, reworked, or temporarily released after a quality issue. The RFQ or corrective action plan should define defect criteria, sort method, accepted and rejected quantities, label wording, hold tags, photos, sample retention, inspector responsibility, report format, and when normal shipment labels can resume.<\/p>\n<p>After a defect is found, the buyer often needs usable stock quickly. Sorting and containment can help, but only if the accepted parts are clearly labeled and the evidence shows what was checked. Otherwise receiving may not know whether a carton is normal production, sorted stock, reworked stock, or temporary approved stock.<\/p>\n<p>Use this page with the <a href=\"\/stamped-part-containment-plan-template\/\">containment plan template<\/a>, <a href=\"\/supplier-corrective-action-stamped-parts\/\">supplier corrective action guide<\/a>, <a href=\"\/stamped-part-deviation-concession-approval-guide\/\">deviation and concession approval guide<\/a>, and <a href=\"\/stamped-parts-cosmetic-functional-defect-boundary-guide\/\">cosmetic and functional defect boundary guide<\/a>.<\/p>\n<h2>Containment evidence to define<\/h2>\n<table class=\"msp-content-table\">\n<thead>\n<tr>\n<th>Evidence<\/th>\n<th>Why it matters<\/th>\n<th>RFQ or action-plan detail<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Defect criteria<\/td>\n<td>Sorters need the same pass\/fail rule as the buyer.<\/td>\n<td>Photos, limit samples, measurement limit, and escalation rule.<\/td>\n<\/tr>\n<tr>\n<td>Quantity record<\/td>\n<td>Buyer needs to know what was checked and what remains at risk.<\/td>\n<td>Checked, accepted, rejected, reworked, held, and shipped quantities.<\/td>\n<\/tr>\n<tr>\n<td>Label wording<\/td>\n<td>Receiving must identify sorted or temporary approved stock.<\/td>\n<td>Sorted label, hold tag, deviation label, date, inspector, and lot ID.<\/td>\n<\/tr>\n<tr>\n<td>Exit rule<\/td>\n<td>Containment should not last forever without approval.<\/td>\n<td>Clean-point lot, corrective action milestone, and normal-label resume rule.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Separate sorted stock from normal stock<\/h2>\n<p>A containment action fails if sorted cartons look the same as normal production. Labels should show what was checked, who checked it, when it was checked, which lot or carton was included, and whether the stock is accepted, held, reworked, rejected, or released under deviation.<\/p>\n<p>If a defect is visual, use photos or limit samples. If it is dimensional, use a gage or measurement rule. If it is functional, define the test. The label should not simply say inspected unless the inspection criteria and report are connected to the carton or lot.<\/p>\n<h2>Keep evidence tied to the buyer decision<\/h2>\n<p>Containment often happens under time pressure. The buyer may approve temporary shipment while root cause is still open. In that case, the label and report should show the temporary rule, expiry date, affected quantity, and whether future lots still need sorting. Use the <a href=\"\/production-lot-first-off-last-off-stamped-parts-guide\/\">first-off and last-off guide<\/a> when the clean point depends on production lot release.<\/p>\n<p>For mixed inventory, make the receiving path obvious. Sorted stock, unsorted stock, reworked stock, and deviation-approved stock should not share the same label or pallet position without clear separation. Connect labels to the <a href=\"\/stamped-parts-carton-label-barcode-receiving-guide\/\">carton label and barcode guide<\/a> if receiving scans cartons into inventory.<\/p>\n<h2>RFQ details to include<\/h2>\n<ul>\n<li>Defect description, affected feature, drawing revision, lot range, suspect quantity, current stock location, and buyer urgency.<\/li>\n<li>Pass\/fail criteria: drawing limit, limit sample, photo standard, test method, gage, inspection lighting, magnification, or functional check.<\/li>\n<li>Sorting method, sample size or 100% sort rule, inspector qualification, rework rule, rejected-part handling, and second-check requirement.<\/li>\n<li>Label wording for sorted, held, rejected, reworked, deviation-approved, and normal stock; include date, lot, quantity, inspector, and report ID.<\/li>\n<li>Report format, photos, retained samples, accepted and rejected counts, clean-point rule, and containment exit condition.<\/li>\n<li>Shipment timing, replacement needs, line-down risk, annual volume, and whether buyer approval is required before sorted stock ships.<\/li>\n<\/ul>\n<h2>How to compare supplier answers<\/h2>\n<p>A useful answer gives a clear separation method and evidence package. A weak answer only says all stock will be inspected. Ask what label will be on the carton and what report receiving can use to release the parts.<\/p>\n<p>If the issue affects function or safety, ask whether sorted stock needs buyer approval before shipment. Sorting can reduce risk, but it should not hide an unresolved process problem or ship parts outside the agreed acceptance rule.<\/p>\n<p>Send defect photos, lot data, acceptance criteria, line urgency, and label expectations through the <a href=\"\/contact\/\">contact page<\/a>. Use the <a href=\"\/contact\/\">RFQ form<\/a> to request containment labels and sorting evidence when a quality issue affects current supply.<\/p>\n<h2>FAQ<\/h2>\n<div itemscope itemtype=\"https:\/\/schema.org\/FAQPage\">\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What should a containment label show?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">It should show part number, revision, lot, quantity, status, sort date, inspector or team, defect checked, report ID, and any deviation or hold condition.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">Is sorting the same as corrective action?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">No. Sorting protects current supply. Corrective action should still identify root cause, permanent fix, clean point, and prevention method.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">Can sorted stamped parts ship before root cause is closed?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Sometimes, if the buyer approves temporary shipment and the sorting criteria, labels, reports, and affected quantities are controlled.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What should buyers send for containment planning?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Send defect photos, drawings, lot range, quantity at risk, pass\/fail rule, urgency, label requirements, and approval responsibility.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What should a containment label show?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It should show part number, revision, lot, quantity, status, sort date, inspector or team, defect checked, report ID, and any deviation or hold condition.\"}},{\"@type\":\"Question\",\"name\":\"Is sorting the same as corrective action?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Sorting protects current supply. Corrective action should still identify root cause, permanent fix, clean point, and prevention method.\"}},{\"@type\":\"Question\",\"name\":\"Can sorted stamped parts ship before root cause is closed?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Sometimes, if the buyer approves temporary shipment and the sorting criteria, labels, reports, and affected quantities are controlled.\"}},{\"@type\":\"Question\",\"name\":\"What should buyers send for containment planning?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Send defect photos, drawings, lot range, quantity at risk, pass\/fail rule, urgency, label requirements, and approval responsibility.\"}}]}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A buyer guide for labeling sorted stamped parts and recording evidence during containment or temporary shipment control.<\/p>\n","protected":false},"author":1,"featured_media":1825,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-2340","page","type-page","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Containment Label Sorting Guide<\/title>\n<meta name=\"description\" content=\"Control stamped part containment with sorted labels, hold tags, sample evidence, defect criteria, quantities, photos, reports, and RFQ rules.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Containment Label Sorting Guide\" \/>\n<meta property=\"og:description\" content=\"Control stamped part containment with sorted labels, hold tags, sample evidence, defect criteria, quantities, photos, reports, and RFQ rules.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61579126831477\" \/>\n<meta property=\"og:image\" content=\"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@duoshaomali\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-containment-label-sorting-evidence-guide\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-containment-label-sorting-evidence-guide\\\/\",\"name\":\"Containment Label Sorting Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-containment-label-sorting-evidence-guide\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-containment-label-sorting-evidence-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-stamping-assembly-guide-featured-1.webp\",\"datePublished\":\"2026-07-04T12:44:36+00:00\",\"description\":\"Control stamped part containment with sorted labels, hold tags, sample evidence, defect criteria, quantities, photos, reports, and RFQ rules.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-containment-label-sorting-evidence-guide\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-containment-label-sorting-evidence-guide\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-containment-label-sorting-evidence-guide\\\/#primaryimage\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-stamping-assembly-guide-featured-1.webp\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-stamping-assembly-guide-featured-1.webp\",\"width\":800,\"height\":600,\"caption\":\"Metal stamping assembly line showing welding and joining operations for stamped components\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-containment-label-sorting-evidence-guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stamped Part Containment Label and Sorting Evidence Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\",\"description\":\"Custom Precision Metal Stamping &amp; Hardware Components\",\"publisher\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/metalstampingparts.ltd\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"width\":200,\"height\":200,\"caption\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=61579126831477\",\"https:\\\/\\\/x.com\\\/duoshaomali\"],\"knowsAbout\":[\"Metal Stamping\",\"Progressive Die Stamping\",\"Deep Draw Stamping\",\"Sheet Metal Forming\",\"Stamping Die Design\",\"Precision Metal Parts Manufacturing\",\"Aluminum Stamping\",\"Stainless Steel Stamping\",\"Automotive Metal Components\",\"Aerospace Precision Parts\",\"CNC Tooling\",\"Quality Control and Inspection\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Containment Label Sorting Guide","description":"Control stamped part containment with sorted labels, hold tags, sample evidence, defect criteria, quantities, photos, reports, and RFQ rules.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/","og_locale":"en_US","og_type":"article","og_title":"Containment Label Sorting Guide","og_description":"Control stamped part containment with sorted labels, hold tags, sample evidence, defect criteria, quantities, photos, reports, and RFQ rules.","og_url":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/","og_site_name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61579126831477","og_image":[{"width":800,"height":600,"url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_site":"@duoshaomali","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/","url":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/","name":"Containment Label Sorting Guide","isPartOf":{"@id":"https:\/\/metalstampingparts.ltd\/#website"},"primaryImageOfPage":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/#primaryimage"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp","datePublished":"2026-07-04T12:44:36+00:00","description":"Control stamped part containment with sorted labels, hold tags, sample evidence, defect criteria, quantities, photos, reports, and RFQ rules.","breadcrumb":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/#primaryimage","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp","width":800,"height":600,"caption":"Metal stamping assembly line showing welding and joining operations for stamped components"},{"@type":"BreadcrumbList","@id":"https:\/\/metalstampingparts.ltd\/stamped-part-containment-label-sorting-evidence-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/metalstampingparts.ltd\/"},{"@type":"ListItem","position":2,"name":"Stamped Part Containment Label and Sorting Evidence Guide"}]},{"@type":"WebSite","@id":"https:\/\/metalstampingparts.ltd\/#website","url":"https:\/\/metalstampingparts.ltd\/","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","description":"Custom Precision Metal Stamping &amp; Hardware Components","publisher":{"@id":"https:\/\/metalstampingparts.ltd\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/metalstampingparts.ltd\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/metalstampingparts.ltd\/#organization","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","url":"https:\/\/metalstampingparts.ltd\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","width":200,"height":200,"caption":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=61579126831477","https:\/\/x.com\/duoshaomali"],"knowsAbout":["Metal Stamping","Progressive Die Stamping","Deep Draw Stamping","Sheet Metal Forming","Stamping Die Design","Precision Metal Parts Manufacturing","Aluminum Stamping","Stainless Steel Stamping","Automotive Metal Components","Aerospace Precision Parts","CNC Tooling","Quality Control and Inspection"]}]}},"_links":{"self":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/comments?post=2340"}],"version-history":[{"count":1,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2340\/revisions"}],"predecessor-version":[{"id":2341,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2340\/revisions\/2341"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/media\/1825"}],"wp:attachment":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/media?parent=2340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}