{"id":2158,"date":"2026-07-01T21:33:03","date_gmt":"2026-07-01T13:33:03","guid":{"rendered":"https:\/\/metalstampingparts.ltd\/?page_id=2158"},"modified":"2026-07-01T21:33:03","modified_gmt":"2026-07-01T13:33:03","slug":"stamping-die-modification-vs-new-tooling","status":"publish","type":"page","link":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/","title":{"rendered":"Die Modification vs New Tooling for Stamping"},"content":{"rendered":"<p><strong>Short answer:<\/strong> Choose die modification when the existing stamping tool is healthy, the revision is local, part volume still matches the tool type, and sample risk is manageable. Choose new tooling when the change affects strip layout, stations, forming sequence, datum structure, material, tolerance strategy, or long-term production economics.<\/p>\n<p>A die modification can look cheaper than new tooling, but it is not always the lower-risk choice. If the existing die is worn, poorly documented, or built around assumptions that no longer fit the part, modifying it can turn a clean engineering change into repeated sample failures, burr problems, downtime, or slow production.<\/p>\n<p>This guide helps buyers compare die modification, insert replacement, tool transfer, and new tooling. Use it with the <a href=\"\/metal-stamping-engineering-change-control-guide\/\">engineering change control guide<\/a>, the <a href=\"\/metal-stamping-tool-ownership-transfer-guide\/\">tool ownership transfer guide<\/a>, and the <a href=\"\/stamping-tooling-tryout-and-sample-approval-guide\/\">tooling tryout and sample approval guide<\/a>.<\/p>\n<h2>Decision factors<\/h2>\n<table class=\"msp-content-table\">\n<thead>\n<tr>\n<th>Factor<\/th>\n<th>Modification may work when<\/th>\n<th>New tooling is safer when<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Revision scope<\/td>\n<td>Only one hole, slot, edge, or local forming feature changes.<\/td>\n<td>The change affects datum structure, strip layout, or several stations.<\/td>\n<\/tr>\n<tr>\n<td>Tool condition<\/td>\n<td>The die has maintenance records, stable samples, and serviceable inserts.<\/td>\n<td>The die is worn, undocumented, damaged, or already causing quality escapes.<\/td>\n<\/tr>\n<tr>\n<td>Volume outlook<\/td>\n<td>Remaining demand is limited and the old tool can meet schedule.<\/td>\n<td>Annual volume, run speed, or tool life needs are increasing.<\/td>\n<\/tr>\n<tr>\n<td>Tolerance risk<\/td>\n<td>The changed feature is not a CTQ dimension and inspection is simple.<\/td>\n<td>The revision changes critical dimensions, contact geometry, or flatness.<\/td>\n<\/tr>\n<tr>\n<td>Timing<\/td>\n<td>A quick sample is needed and the buyer accepts controlled risk.<\/td>\n<td>Launch timing allows a cleaner tool build and long-term cost matters.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>When modification is the practical choice<\/h2>\n<p>Modification is often reasonable for a small clearance change, added slot, local relief, edge trim change, or minor bend adjustment. It is also useful when the buyer needs a bridge supply while a longer-term tool plan is reviewed. In these cases, ask for a written scope: what station changes, what insert changes, what samples will be made, and what inspection points will confirm the result.<\/p>\n<p>Do not treat the modified sample as automatically approved. Run the changed area through the <a href=\"\/metal-stamping-first-article-inspection-checklist\/\">first article inspection checklist<\/a>, then confirm any affected burr, flatness, springback, or assembly feature. For geometry changes, the <a href=\"\/metal-stamping-drawing-review-checklist\/\">drawing review checklist<\/a> helps catch missing revision details before the tool is cut.<\/p>\n<h2>When new tooling is the cleaner decision<\/h2>\n<p>New tooling is usually safer when the part revision changes the forming sequence, strip carrier, feed direction, material thickness, tolerance strategy, or annual volume. It may also be better when the old die has no CAD data, no strip layout, no maintenance record, or no spare inserts. A buyer may spend less on modification today and more on sorting, downtime, or another change later.<\/p>\n<p>For high-volume programs, compare the tool decision with the <a href=\"\/progressive-die-design-checklist\/\">progressive die design checklist<\/a> and the <a href=\"\/progressive-die-stamping-cost\/\">progressive die stamping cost guide<\/a>. If the program is moving suppliers, review tool access, ownership proof, and restart evidence before assuming the old die can be reused.<\/p>\n<h2>Information to send for a tool decision<\/h2>\n<ul>\n<li>Current drawing, revised drawing, and marked change summary.<\/li>\n<li>Existing samples and new target sample if available.<\/li>\n<li>Photos of the die, strip layout, station drawings, and known tool history.<\/li>\n<li>Maintenance records, spare inserts, previous repair notes, and current issues.<\/li>\n<li>Annual volume, remaining program life, first release quantity, and launch date.<\/li>\n<li>Critical dimensions, inspection method, and assembly fit requirements.<\/li>\n<li>Material grade, thickness, temper, finish, and any planned material change.<\/li>\n<li>Tool ownership expectation and whether the tool may be transferred later.<\/li>\n<\/ul>\n<h2>Cost comparison is not only tool price<\/h2>\n<p>Compare the total effect: modification price, sample rounds, downtime, production speed, inspection burden, repair risk, scrap, and remaining tool life. A modified tool can be a good answer for low remaining demand. For a stable long-run part, new tooling can reduce piece price, improve control, and remove old compromises.<\/p>\n<p>Use the <a href=\"\/metal-stamping-landed-cost-guide\/\">landed cost guide<\/a> if the supplier quotes only the immediate tooling charge. A lower tool price does not help if the buyer later pays through premium freight, sorting, rework, or repeated engineering review.<\/p>\n<h2>RFQ request for die modification or new tooling<\/h2>\n<p>Ask the supplier to quote at least two options when the answer is not obvious: modify existing tool and build new tooling. The quote should state assumptions, sample timing, expected limitations, and what data is missing. For a tool decision review, send old and new drawings, samples, die photos, annual volume, and target schedule through the <a href=\"\/contact\/\">contact page<\/a>. For a formal quote, use the <a href=\"\/contact\/\">RFQ form<\/a> and ask the supplier to separate tooling, sample, and production assumptions.<\/p>\n<h2>FAQ: die modification vs new tooling<\/h2>\n<div itemscope itemtype=\"https:\/\/schema.org\/FAQPage\">\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">When is die modification usually enough?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">It is often enough for a local feature change when the die is healthy, the strip layout does not change, and the affected dimensions are easy to verify.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">When should a buyer choose new stamping tooling?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">New tooling is safer when the revision affects forming sequence, strip layout, material, tolerance strategy, long-run volume, or when the old die is worn or undocumented.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What files are needed to quote a die modification?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Send old and new drawings, marked changes, samples, die photos, strip layout if available, maintenance records, annual volume, and launch timing.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">Can a transferred die be modified by a new supplier?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Sometimes, but the supplier should first inspect tool condition, ownership, missing records, spare parts, current samples, and whether the press setup matches their equipment.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"When is die modification usually enough?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It is often enough for a local feature change when the die is healthy, the strip layout does not change, and the affected dimensions are easy to verify.\"}},{\"@type\":\"Question\",\"name\":\"When should a buyer choose new stamping tooling?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"New tooling is safer when the revision affects forming sequence, strip layout, material, tolerance strategy, long-run volume, or when the old die is worn or undocumented.\"}},{\"@type\":\"Question\",\"name\":\"What files are needed to quote a die modification?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Send old and new drawings, marked changes, samples, die photos, strip layout if available, maintenance records, annual volume, and launch timing.\"}},{\"@type\":\"Question\",\"name\":\"Can a transferred die be modified by a new supplier?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Sometimes, but the supplier should first inspect tool condition, ownership, missing records, spare parts, current samples, and whether the press setup matches their equipment.\"}}]}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A decision guide for buyers comparing die modification, insert replacement, tool transfer, and new tooling for stamped part revisions.<\/p>\n","protected":false},"author":1,"featured_media":1818,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-2158","page","type-page","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Die Modification vs New Tooling for Stamping<\/title>\n<meta name=\"description\" content=\"Decide between die modification and new stamping tooling by checking revision scope, tool condition, volume, timing, ownership, and sample risk.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Die Modification vs New Tooling for Stamping\" \/>\n<meta property=\"og:description\" content=\"Decide between die modification and new stamping tooling by checking revision scope, tool condition, volume, timing, ownership, and sample risk.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/\" \/>\n<meta property=\"og:site_name\" content=\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61579126831477\" \/>\n<meta property=\"og:image\" content=\"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/blanking-process-guide-featured-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@duoshaomali\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamping-die-modification-vs-new-tooling\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamping-die-modification-vs-new-tooling\\\/\",\"name\":\"Die Modification vs New Tooling for Stamping\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamping-die-modification-vs-new-tooling\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamping-die-modification-vs-new-tooling\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/blanking-process-guide-featured-1.webp\",\"datePublished\":\"2026-07-01T13:33:03+00:00\",\"description\":\"Decide between die modification and new stamping tooling by checking revision scope, tool condition, volume, timing, ownership, and sample risk.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamping-die-modification-vs-new-tooling\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/metalstampingparts.ltd\\\/stamping-die-modification-vs-new-tooling\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamping-die-modification-vs-new-tooling\\\/#primaryimage\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/blanking-process-guide-featured-1.webp\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/blanking-process-guide-featured-1.webp\",\"width\":800,\"height\":800,\"caption\":\"Sheet metal blanking press cutting flat industrial parts in production\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamping-die-modification-vs-new-tooling\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Die Modification vs New Tooling for Stamping\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\",\"description\":\"Custom Precision Metal Stamping &amp; Hardware Components\",\"publisher\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/metalstampingparts.ltd\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"width\":200,\"height\":200,\"caption\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=61579126831477\",\"https:\\\/\\\/x.com\\\/duoshaomali\"],\"knowsAbout\":[\"Metal Stamping\",\"Progressive Die Stamping\",\"Deep Draw Stamping\",\"Sheet Metal Forming\",\"Stamping Die Design\",\"Precision Metal Parts Manufacturing\",\"Aluminum Stamping\",\"Stainless Steel Stamping\",\"Automotive Metal Components\",\"Aerospace Precision Parts\",\"CNC Tooling\",\"Quality Control and Inspection\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Die Modification vs New Tooling for Stamping","description":"Decide between die modification and new stamping tooling by checking revision scope, tool condition, volume, timing, ownership, and sample risk.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/","og_locale":"en_US","og_type":"article","og_title":"Die Modification vs New Tooling for Stamping","og_description":"Decide between die modification and new stamping tooling by checking revision scope, tool condition, volume, timing, ownership, and sample risk.","og_url":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/","og_site_name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61579126831477","og_image":[{"width":800,"height":800,"url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/blanking-process-guide-featured-1.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_site":"@duoshaomali","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/","url":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/","name":"Die Modification vs New Tooling for Stamping","isPartOf":{"@id":"https:\/\/metalstampingparts.ltd\/#website"},"primaryImageOfPage":{"@id":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/#primaryimage"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/#primaryimage"},"thumbnailUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/blanking-process-guide-featured-1.webp","datePublished":"2026-07-01T13:33:03+00:00","description":"Decide between die modification and new stamping tooling by checking revision scope, tool condition, volume, timing, ownership, and sample risk.","breadcrumb":{"@id":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/#primaryimage","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/blanking-process-guide-featured-1.webp","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/blanking-process-guide-featured-1.webp","width":800,"height":800,"caption":"Sheet metal blanking press cutting flat industrial parts in production"},{"@type":"BreadcrumbList","@id":"https:\/\/metalstampingparts.ltd\/stamping-die-modification-vs-new-tooling\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/metalstampingparts.ltd\/"},{"@type":"ListItem","position":2,"name":"Die Modification vs New Tooling for Stamping"}]},{"@type":"WebSite","@id":"https:\/\/metalstampingparts.ltd\/#website","url":"https:\/\/metalstampingparts.ltd\/","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","description":"Custom Precision Metal Stamping &amp; Hardware Components","publisher":{"@id":"https:\/\/metalstampingparts.ltd\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/metalstampingparts.ltd\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/metalstampingparts.ltd\/#organization","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","url":"https:\/\/metalstampingparts.ltd\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","width":200,"height":200,"caption":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=61579126831477","https:\/\/x.com\/duoshaomali"],"knowsAbout":["Metal Stamping","Progressive Die Stamping","Deep Draw Stamping","Sheet Metal Forming","Stamping Die Design","Precision Metal Parts Manufacturing","Aluminum Stamping","Stainless Steel Stamping","Automotive Metal Components","Aerospace Precision Parts","CNC Tooling","Quality Control and Inspection"]}]}},"_links":{"self":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/comments?post=2158"}],"version-history":[{"count":1,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2158\/revisions"}],"predecessor-version":[{"id":2159,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2158\/revisions\/2159"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/media\/1818"}],"wp:attachment":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/media?parent=2158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}