{"id":2391,"date":"2026-07-09T08:43:20","date_gmt":"2026-07-09T00:43:20","guid":{"rendered":"https:\/\/metalstampingparts.ltd\/?page_id=2391"},"modified":"2026-07-09T08:43:20","modified_gmt":"2026-07-09T00:43:20","slug":"stamped-parts-supplier-exit-transition-checklist","status":"publish","type":"page","link":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/","title":{"rendered":"Stamped Parts Supplier Exit and Transition Checklist"},"content":{"rendered":"<p><strong>Short answer:<\/strong> A stamped parts supplier exit should control tooling, inspection fixtures, drawings, open purchase orders, inventory, quality records, certificates, packaging standards, and transition timing. Buyers should not wait until the relationship ends to confirm who owns the die, which files are current, and what evidence must move with the program.<\/p>\n<p>Supplier exits happen for many reasons: quality problems, capacity limits, price changes, plant closure, commercial disputes, or dual-sourcing strategy. The risk is highest when tooling, fixtures, records, and inventory are not controlled before the transition starts.<\/p>\n<p>Use this checklist with the <a href=\"\/metal-stamping-supplier-transfer-checklist\/\">supplier transfer checklist<\/a>, <a href=\"\/metal-stamping-tool-ownership-transfer-guide\/\">tool ownership transfer guide<\/a>, <a href=\"\/stamped-parts-inspection-fixture-ownership-calibration-guide\/\">inspection fixture guide<\/a>, and <a href=\"\/metal-stamping-dual-sourcing-backup-supplier-qualification-guide\/\">backup supplier qualification guide<\/a>.<\/p>\n<h2>Supplier exit items to secure<\/h2>\n<table class=\"msp-content-table\">\n<thead>\n<tr>\n<th>Item<\/th>\n<th>Why it matters<\/th>\n<th>RFQ detail to confirm<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Tooling and fixtures<\/td>\n<td>Production cannot transfer if assets are unclear or unavailable.<\/td>\n<td>Ownership, condition, storage, photos, calibration, spare parts, and release date.<\/td>\n<\/tr>\n<tr>\n<td>Controlled technical files<\/td>\n<td>Old drawings create quote and approval mistakes.<\/td>\n<td>2D drawing, 3D model, revision log, deviations, samples, and customer standards.<\/td>\n<\/tr>\n<tr>\n<td>Inventory and open orders<\/td>\n<td>Exit timing can create shortages or obsolete stock.<\/td>\n<td>Finished goods, WIP, raw material, open PO, consignment, and last shipment plan.<\/td>\n<\/tr>\n<tr>\n<td>Quality and shipment records<\/td>\n<td>The next supplier needs historical risk data.<\/td>\n<td>FAI, PPAP, complaints, corrective actions, certificates, packing rules, and receiving issues.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Start with an asset list<\/h2>\n<p>List every die, fixture, gage, spare insert, strip layout, setup sheet, and special packaging asset tied to the part. Mark ownership, physical location, condition, asset ID, and whether transfer is allowed.<\/p>\n<p>Photograph tooling and fixtures before movement. Photos help resolve disputes about condition, missing components, rust, storage damage, or incomplete spare sets.<\/p>\n<h2>Freeze the controlled drawing package<\/h2>\n<p>Before quoting a new source, confirm the current drawing revision, model, tolerance exceptions, open deviations, material, finish, inspection plan, and packaging standard. Do not rely on old supplier notes as the only source of truth.<\/p>\n<p>If the current supplier has been making parts from informal clarifications, convert those decisions into a controlled package before sending the RFQ to a replacement supplier.<\/p>\n<p>This is also the right time to remove obsolete files from the package before quoting.<\/p>\n<h2>Protect supply during the transition window<\/h2>\n<p>Supplier exit is not only a tooling move. Buyers need enough finished goods, WIP, material, and approved shipment capacity to cover tool removal, transport, tryout, sample approval, and first production at the new source.<\/p>\n<p>Use the <a href=\"\/stamped-parts-capacity-reservation-allocation-risk-guide\/\">capacity reservation guide<\/a> and <a href=\"\/stamped-parts-end-of-life-last-time-buy-planning-guide\/\">last-time-buy guide<\/a> when exit timing affects service or production coverage.<\/p>\n<p>If the current supplier must keep shipping during qualification, define the overlap period and the minimum evidence required for each bridge shipment.<\/p>\n<h2>Move quality history with the program<\/h2>\n<p>A new supplier should know which features have caused rejects, which dimensions are difficult to measure, which packaging failed, and which corrective actions are still relevant.<\/p>\n<p>Provide approved samples, limit samples, gage correlation notes, material certificates, previous complaints, and current inspection frequency. This shortens the learning curve and reduces repeated mistakes.<\/p>\n<h2>Define what the old supplier must still support<\/h2>\n<p>Some exits still need final shipments, document copies, tool loading support, inventory reconciliation, certificate reissue, or corrective action closure. Put those obligations in writing before access becomes difficult.<\/p>\n<p>If a commercial dispute exists, keep the technical transition record factual: asset list, dates, files, quantities, quality status, and release evidence.<\/p>\n<h2>RFQ details to include<\/h2>\n<p>Send the replacement supplier the controlled file package, asset status, tooling transfer plan, fixture data, demand bridge, current quality issues, packaging evidence, and required approval timeline.<\/p>\n<p>Send transition requirements through the <a href=\"\/contact\/\">contact page<\/a>. Use the <a href=\"\/contact\/\">RFQ form<\/a> to request transfer review, tooling tryout, and production launch assumptions.<\/p>\n<h2>Buyer file to keep with the quote<\/h2>\n<p>Keep this stamped parts supplier exit and transition checklist with the drawing revision, quote number, supplier assumptions, owner of each open action, and the latest approval record. That file helps future supplier reviews, audits, reorders, and transition decisions stay consistent.<\/p>\n<h2>FAQ<\/h2>\n<div itemscope itemtype=\"https:\/\/schema.org\/FAQPage\">\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What is the biggest risk in a supplier exit?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">The biggest risk is losing control of tooling, fixtures, drawings, inventory, and quality history before the replacement supplier is ready.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">Should buyers move tooling before approving a new source?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Not unless bridge inventory and approval timing are clear. Moving tooling too early can stop supply if tryout or sample approval takes longer than expected.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What records should move with the program?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Move current drawings, models, deviations, PPAP or FAI records, inspection plans, complaints, corrective actions, certificates, packaging rules, and approved samples.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">How can buyers reduce transition disruption?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Start with asset control, freeze the technical package, build bridge inventory, qualify the new source, and keep shipment release rules clear during the overlap period.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><script type=\"application\/ld+json\"><\/p>\n<p>{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is the biggest risk in a supplier exit?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The biggest risk is losing control of tooling, fixtures, drawings, inventory, and quality history before the replacement supplier is ready.\"}},{\"@type\":\"Question\",\"name\":\"Should buyers move tooling before approving a new source?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not unless bridge inventory and approval timing are clear. Moving tooling too early can stop supply if tryout or sample approval takes longer than expected.\"}},{\"@type\":\"Question\",\"name\":\"What records should move with the program?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Move current drawings, models, deviations, PPAP or FAI records, inspection plans, complaints, corrective actions, certificates, packaging rules, and approved samples.\"}},{\"@type\":\"Question\",\"name\":\"How can buyers reduce transition disruption?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Start with asset control, freeze the technical package, build bridge inventory, qualify the new source, and keep shipment release rules clear during the overlap period.\"}}]}<\/p>\n<p><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A buyer checklist for moving stamped parts away from a supplier without losing tooling, records, or production continuity.<\/p>\n","protected":false},"author":1,"featured_media":1825,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-2391","page","type-page","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stamped Parts Supplier Exit Checklist<\/title>\n<meta name=\"description\" content=\"Manage stamped parts supplier exit with tooling, fixtures, drawings, inventory, open quality issues, shipment records, and transition risk control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stamped Parts Supplier Exit Checklist\" \/>\n<meta property=\"og:description\" content=\"Manage stamped parts supplier exit with tooling, fixtures, drawings, inventory, open quality issues, shipment records, and transition risk control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/\" \/>\n<meta property=\"og:site_name\" content=\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61579126831477\" \/>\n<meta property=\"og:image\" content=\"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@duoshaomali\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-parts-supplier-exit-transition-checklist\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-parts-supplier-exit-transition-checklist\\\/\",\"name\":\"Stamped Parts Supplier Exit Checklist\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-parts-supplier-exit-transition-checklist\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-parts-supplier-exit-transition-checklist\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-stamping-assembly-guide-featured-1.webp\",\"datePublished\":\"2026-07-09T00:43:20+00:00\",\"description\":\"Manage stamped parts supplier exit with tooling, fixtures, drawings, inventory, open quality issues, shipment records, and transition risk control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-parts-supplier-exit-transition-checklist\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-parts-supplier-exit-transition-checklist\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-parts-supplier-exit-transition-checklist\\\/#primaryimage\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-stamping-assembly-guide-featured-1.webp\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-stamping-assembly-guide-featured-1.webp\",\"width\":800,\"height\":600,\"caption\":\"Metal stamping assembly line showing welding and joining operations for stamped components\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-parts-supplier-exit-transition-checklist\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stamped Parts Supplier Exit and Transition Checklist\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\",\"description\":\"Custom Precision Metal Stamping &amp; Hardware Components\",\"publisher\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/metalstampingparts.ltd\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"width\":200,\"height\":200,\"caption\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=61579126831477\",\"https:\\\/\\\/x.com\\\/duoshaomali\"],\"knowsAbout\":[\"Metal Stamping\",\"Progressive Die Stamping\",\"Deep Draw Stamping\",\"Sheet Metal Forming\",\"Stamping Die Design\",\"Precision Metal Parts Manufacturing\",\"Aluminum Stamping\",\"Stainless Steel Stamping\",\"Automotive Metal Components\",\"Aerospace Precision Parts\",\"CNC Tooling\",\"Quality Control and Inspection\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stamped Parts Supplier Exit Checklist","description":"Manage stamped parts supplier exit with tooling, fixtures, drawings, inventory, open quality issues, shipment records, and transition risk control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/","og_locale":"en_US","og_type":"article","og_title":"Stamped Parts Supplier Exit Checklist","og_description":"Manage stamped parts supplier exit with tooling, fixtures, drawings, inventory, open quality issues, shipment records, and transition risk control.","og_url":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/","og_site_name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61579126831477","og_image":[{"width":800,"height":600,"url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_site":"@duoshaomali","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/","url":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/","name":"Stamped Parts Supplier Exit Checklist","isPartOf":{"@id":"https:\/\/metalstampingparts.ltd\/#website"},"primaryImageOfPage":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/#primaryimage"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/#primaryimage"},"thumbnailUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp","datePublished":"2026-07-09T00:43:20+00:00","description":"Manage stamped parts supplier exit with tooling, fixtures, drawings, inventory, open quality issues, shipment records, and transition risk control.","breadcrumb":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/#primaryimage","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp","width":800,"height":600,"caption":"Metal stamping assembly line showing welding and joining operations for stamped components"},{"@type":"BreadcrumbList","@id":"https:\/\/metalstampingparts.ltd\/stamped-parts-supplier-exit-transition-checklist\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/metalstampingparts.ltd\/"},{"@type":"ListItem","position":2,"name":"Stamped Parts Supplier Exit and Transition Checklist"}]},{"@type":"WebSite","@id":"https:\/\/metalstampingparts.ltd\/#website","url":"https:\/\/metalstampingparts.ltd\/","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","description":"Custom Precision Metal Stamping &amp; Hardware Components","publisher":{"@id":"https:\/\/metalstampingparts.ltd\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/metalstampingparts.ltd\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/metalstampingparts.ltd\/#organization","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","url":"https:\/\/metalstampingparts.ltd\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","width":200,"height":200,"caption":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=61579126831477","https:\/\/x.com\/duoshaomali"],"knowsAbout":["Metal Stamping","Progressive Die Stamping","Deep Draw Stamping","Sheet Metal Forming","Stamping Die Design","Precision Metal Parts Manufacturing","Aluminum Stamping","Stainless Steel Stamping","Automotive Metal Components","Aerospace Precision Parts","CNC Tooling","Quality Control and Inspection"]}]}},"_links":{"self":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2391","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/comments?post=2391"}],"version-history":[{"count":1,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2391\/revisions"}],"predecessor-version":[{"id":2392,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2391\/revisions\/2392"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/media\/1825"}],"wp:attachment":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/media?parent=2391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}