{"id":2357,"date":"2026-07-07T01:07:59","date_gmt":"2026-07-06T17:07:59","guid":{"rendered":"https:\/\/metalstampingparts.ltd\/?page_id=2357"},"modified":"2026-07-07T01:13:31","modified_gmt":"2026-07-06T17:13:31","slug":"stamped-part-production-approval-sample-evidence-guide","status":"publish","type":"page","link":"https:\/\/metalstampingparts.ltd\/ceb\/stamped-part-production-approval-sample-evidence-guide\/","title":{"rendered":"Stamped Bahin Production Approval Sample Evidence Giya"},"content":{"rendered":"<p><strong>Short answer:<\/strong> Production approval samples for giporma nga mga piyesa should include more than a few physical pieces. Buyers should define sample quantity, drawing revision, material lot, finish batch, dimensional report, critical feature evidence, burr and cosmetic review, packaging trial, photo record, deviation status, and written signoff before the tagasuplay treats production release as approved.<\/p>\n<p>A first sample can look acceptable on a desk and still fail production release because the evidence package is incomplete. The buyer needs to know whether the sample represents the final tool, final material, final finish, final packaging, and final inspection method.<\/p>\n<p>Use this guide with the <a href=\"\/stamping-tooling-tryout-and-sample-approval-guide\/\">tooling tryout and sample approval guide<\/a>, <a href=\"\/metal-stamping-ppap-fai-package\/\">PPAP and FAI package guide<\/a>, <a href=\"\/stamped-part-golden-sample-limit-sample-approval-guide\/\">golden and limit sample guide<\/a>, and <a href=\"\/production-lot-first-off-last-off-stamped-parts-guide\/\">first-off last-off guide<\/a>.<\/p>\n<h2>Approval sample evidence to define<\/h2>\n<table class=\"msp-content-table\">\n<thead>\n<tr>\n<th>Evidence<\/th>\n<th>Why it matters<\/th>\n<th>RFQ or approval detail<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sample source<\/td>\n<td>A hand-adjusted trial piece may not represent normal production.<\/td>\n<td>Tool state, press, material lot, finish batch, and sample date.<\/td>\n<\/tr>\n<tr>\n<td>Dimensional report<\/td>\n<td>Critical dimensions need measured evidence, not visual approval.<\/td>\n<td>Datum setup, gage method, sample size, and out-of-tolerance note.<\/td>\n<\/tr>\n<tr>\n<td>Surface and burr review<\/td>\n<td>Cosmetic and edge acceptance can be subjective.<\/td>\n<td>Burr direction, edge break, scratch limits, plating marks, and limit sample photos.<\/td>\n<\/tr>\n<tr>\n<td>Packaging trial<\/td>\n<td>Approved parts can be damaged after approval if packaging was not tested.<\/td>\n<td>Tray, carton, label, separator, no-touch zones, and first shipment photos.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Define what approval means<\/h2>\n<p>Production approval should not mean the buyer merely received samples. It should mean the buyer reviewed the agreed evidence and released the tagasuplay to make production parts under the same controlled condition. If some items are conditionally approved, record the conditions and due dates.<\/p>\n<p>For example, dimensional approval may be complete while packaging approval is still open. Plating may be approved visually but still waiting for thickness data. A deviation may be accepted for prototype samples but not for production. The approval record should separate these cases.<\/p>\n<p>The approval owner should be named before samples ship. If engineering, quality, and purchasing all wait for another team to sign off, the tagasuplay may hold production or start with unclear risk.<\/p>\n<h2>Tie samples to final process conditions<\/h2>\n<p>Ask whether the samples were made from the final die, final strip layout, final press, final material thickness, and final finish. If the tagasuplay used temporary tooling, soft tooling, or manual deburring, the evidence should say so. This prevents the team from approving a process that will not be used in production.<\/p>\n<p>When functional assembly is the real risk, sample approval should include fit photos, gage checks, or assembly trial results. For measurement alignment, connect this requirement to the <a href=\"\/buyer-supplier-gage-correlation-stamped-parts-guide\/\">buyer-tagasuplay gage correlation guide<\/a> and <a href=\"\/stamped-part-datum-functional-gage-guide\/\">functional gage guide<\/a>.<\/p>\n<h2>RFQ details to include<\/h2>\n<ul>\n<li>Sample quantity, drawing revision, sample source, tool status, press condition, material lot, finish batch, and production intent.<\/li>\n<li>Required evidence: dimensional report, material certificate, finish report, photos, burr review, cosmetic review, gage result, and packaging trial.<\/li>\n<li>Approval categories: approved, conditionally approved, rejected, approved for prototype only, or approved pending document correction.<\/li>\n<li>Deviation rule, re-sample trigger, change notice rule, sample labeling, retained sample storage, and expiration of approval if design changes.<\/li>\n<li>Packaging approval: carton, tray, label, barcode, separator, no-touch surfaces, transit risk, and first shipment photo requirement.<\/li>\n<li>Launch date, pilot run quantity, annual volume, buyer signoff owner, and what documents must be complete before production release.<\/li>\n<\/ul>\n<h2>How to compare tagasuplay answers<\/h2>\n<p>A strong tagasuplay answer tells how the sample was made and what evidence proves it. A weak answer only says samples will be sent. Ask for a sample label and approval checklist before the parts ship.<\/p>\n<p>If the tagasuplay cannot provide every document at once, decide which records are required for sample review and which can follow before production. Do not let missing evidence turn into silent approval.<\/p>\n<p>Ipadala sample approval requirements, drawing revision, critical features, finish needs, and packaging notes through the <a href=\"\/contact\/\">kontak page<\/a>. Use the <a href=\"\/contact\/\">RFQ form<\/a> to request evidence-backed production approval samples.<\/p>\n<h2>FAQ<\/h2>\n<div itemscope itemtype=\"https:\/\/schema.org\/FAQPage\">\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What should be included with stamped part approval samples?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Include sample quantity, drawing revision, material and finish evidence, dimensional report, critical feature checks, burr and surface review, packaging trial, photos, and signoff status.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">Is sample approval the same as PPAP?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Not always. PPAP is a formal package for certain programs. Sample approval can be simpler, but it should still define evidence and release status.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">Can production start before all sample documents are complete?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Only if the buyer approves a conditional release and records which documents or corrections remain open.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What should buyers send for sample approval planning?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Ipadala drawings, critical features, acceptance limits, sample quantity, report format, finish requirements, packaging rules, and approval deadline.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What should be included with stamped part approval samples?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Include sample quantity, drawing revision, material and finish evidence, dimensional report, critical feature checks, burr and surface review, packaging trial, photos, and signoff status.\"}},{\"@type\":\"Question\",\"name\":\"Is sample approval the same as PPAP?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not always. PPAP is a formal package for certain programs. Sample approval can be simpler, but it should still define evidence and release status.\"}},{\"@type\":\"Question\",\"name\":\"Can production start before all sample documents are complete?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Only if the buyer approves a conditional release and records which documents or corrections remain open.\"}},{\"@type\":\"Question\",\"name\":\"What should buyers send for sample approval planning?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Ipadala drawings, critical features, acceptance limits, sample quantity, report format, finish requirements, packaging rules, and approval deadline.\"}}]}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A buyer guide for approving stamped part samples with evidence before production release, separate from routine PPAP or FAI packages.<\/p>","protected":false},"author":1,"featured_media":1825,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-2357","page","type-page","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Production Approval Sample Evidence<\/title>\n<meta name=\"description\" content=\"Approve stamped part production samples with dimensional reports, material certificates, finish evidence, photos, packaging checks, and signoff rules.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/metalstampingparts.ltd\/ceb\/stamped-part-production-approval-sample-evidence-guide\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Production Approval Sample Evidence\" \/>\n<meta property=\"og:description\" content=\"Approve stamped part production samples with dimensional reports, material certificates, finish evidence, photos, packaging checks, and signoff rules.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/metalstampingparts.ltd\/ceb\/stamped-part-production-approval-sample-evidence-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61579126831477\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-06T17:13:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-stamping-assembly-guide-featured-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@duoshaomali\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-production-approval-sample-evidence-guide\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-production-approval-sample-evidence-guide\\\/\",\"name\":\"Production Approval Sample Evidence\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-production-approval-sample-evidence-guide\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-production-approval-sample-evidence-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-paghulma-assembly-guide-featured-1.webp\",\"datePublished\":\"2026-07-06T17:07:59+00:00\",\"dateModified\":\"2026-07-06T17:13:31+00:00\",\"description\":\"Approve stamped part production samples with dimensional reports, material certificates, finish evidence, photos, packaging checks, and signoff rules.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-production-approval-sample-evidence-guide\\\/#breadcrumb\"},\"inLanguage\":\"ceb\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-production-approval-sample-evidence-guide\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ceb\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-production-approval-sample-evidence-guide\\\/#primaryimage\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-paghulma-assembly-guide-featured-1.webp\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/metal-paghulma-assembly-guide-featured-1.webp\",\"width\":800,\"height\":600,\"caption\":\"paghulma sa metal assembly line showing welding and joining operations for stamped components\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/stamped-part-production-approval-sample-evidence-guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Panimalay\",\"item\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stamped Bahin Production Approval Sample Evidence Giya\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - paghulma sa metal\",\"description\":\"Custom Precision paghulma sa metal &amp; Hardware Components\",\"publisher\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/metalstampingparts.ltd\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ceb\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - paghulma sa metal\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ceb\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"width\":200,\"height\":200,\"caption\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - paghulma sa metal\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=\",\"https:\\\/\\\/x.com\\\/duoshaomali\"],\"knowsAbout\":[\"paghulma sa metal\",\"progresibong hulmahan paghulma\",\"lawom nga paghulma paghulma\",\"palid nga metal Forming\",\"paghulma Die Design\",\"Precision Metal Mga Bahin Paggama\",\"Aluminum paghulma\",\"Stainless Steel paghulma\",\"awtomotibo Metal Components\",\"Aerospace Precision Mga Bahin\",\"CNC Tooling\",\"Kalidad Control and Inspection\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Production Approval Sample Evidence","description":"Approve stamped part production samples with dimensional reports, material certificates, finish evidence, photos, packaging checks, and signoff rules.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/metalstampingparts.ltd\/ceb\/stamped-part-production-approval-sample-evidence-guide\/","og_locale":"en_US","og_type":"article","og_title":"Production Approval Sample Evidence","og_description":"Approve stamped part production samples with dimensional reports, material certificates, finish evidence, photos, packaging checks, and signoff rules.","og_url":"https:\/\/metalstampingparts.ltd\/ceb\/stamped-part-production-approval-sample-evidence-guide\/","og_site_name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - paghulma sa metal","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=","article_modified_time":"2026-07-06T17:13:31+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-paghulma-assembly-guide-featured-1.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_site":"@duoshaomali","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/metalstampingparts.ltd\/stamped-part-production-approval-sample-evidence-guide\/","url":"https:\/\/metalstampingparts.ltd\/stamped-part-production-approval-sample-evidence-guide\/","name":"Production Approval Sample Evidence","isPartOf":{"@id":"https:\/\/metalstampingparts.ltd\/#website"},"primaryImageOfPage":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-part-production-approval-sample-evidence-guide\/#primaryimage"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-part-production-approval-sample-evidence-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-paghulma-assembly-guide-featured-1.webp","datePublished":"2026-07-06T17:07:59+00:00","dateModified":"2026-07-06T17:13:31+00:00","description":"Approve stamped part production samples with dimensional reports, material certificates, finish evidence, photos, packaging checks, and signoff rules.","breadcrumb":{"@id":"https:\/\/metalstampingparts.ltd\/stamped-part-production-approval-sample-evidence-guide\/#breadcrumb"},"inLanguage":"ceb","potentialAction":[{"@type":"ReadAction","target":["https:\/\/metalstampingparts.ltd\/stamped-part-production-approval-sample-evidence-guide\/"]}]},{"@type":"ImageObject","inLanguage":"ceb","@id":"https:\/\/metalstampingparts.ltd\/stamped-part-production-approval-sample-evidence-guide\/#primaryimage","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-paghulma-assembly-guide-featured-1.webp","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/metal-paghulma-assembly-guide-featured-1.webp","width":800,"height":600,"caption":"paghulma sa metal assembly line showing welding and joining operations for stamped components"},{"@type":"BreadcrumbList","@id":"https:\/\/metalstampingparts.ltd\/stamped-part-production-approval-sample-evidence-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Panimalay","item":"https:\/\/metalstampingparts.ltd\/"},{"@type":"ListItem","position":2,"name":"Stamped Bahin Production Approval Sample Evidence Giya"}]},{"@type":"WebSite","@id":"https:\/\/metalstampingparts.ltd\/#website","url":"https:\/\/metalstampingparts.ltd\/","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - paghulma sa metal","description":"Custom Precision paghulma sa metal &amp; Hardware Components","publisher":{"@id":"https:\/\/metalstampingparts.ltd\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/metalstampingparts.ltd\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ceb"},{"@type":"Organization","@id":"https:\/\/metalstampingparts.ltd\/#organization","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - paghulma sa metal","url":"https:\/\/metalstampingparts.ltd\/","logo":{"@type":"ImageObject","inLanguage":"ceb","@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","width":200,"height":200,"caption":"Dongguan Chenghui Intelligent Technology Co., Ltd. - paghulma sa metal"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=","https:\/\/x.com\/duoshaomali"],"knowsAbout":["paghulma sa metal","progresibong hulmahan paghulma","lawom nga paghulma paghulma","palid nga metal Forming","paghulma Die Design","Precision Metal Mga Bahin Paggama","Aluminum paghulma","Stainless Steel paghulma","awtomotibo Metal Components","Aerospace Precision Mga Bahin","CNC Tooling","Kalidad Control and Inspection"]}]}},"_links":{"self":[{"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/pages\/2357","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/comments?post=2357"}],"version-history":[{"count":1,"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/pages\/2357\/revisions"}],"predecessor-version":[{"id":2358,"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/pages\/2357\/revisions\/2358"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/media\/1825"}],"wp:attachment":[{"href":"https:\/\/metalstampingparts.ltd\/ceb\/wp-json\/wp\/v2\/media?parent=2357"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}