{"id":2222,"date":"2026-07-04T02:59:46","date_gmt":"2026-07-03T18:59:46","guid":{"rendered":"https:\/\/metalstampingparts.ltd\/?page_id=2222"},"modified":"2026-07-04T02:59:46","modified_gmt":"2026-07-03T18:59:46","slug":"metal-stamping-moq-blanket-order-guide","status":"publish","type":"page","link":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/","title":{"rendered":"Metal Stamping MOQ and Blanket Order Guide"},"content":{"rendered":"<p><strong>Short answer:<\/strong> Metal stamping MOQ is not only a minimum piece count. It is tied to coil purchase quantity, setup time, packaging, inspection, forecast reliability, and how releases are scheduled. A blanket order can reduce unit cost, but only when inventory ownership, release cadence, price breaks, and revision risk are clear.<\/p>\n<p>Many quote comparisons fail because one supplier prices a single release, another prices annual demand, and a third assumes a blanket purchase order. The unit price may look different even when the manufacturing cost is similar. Buyers should make MOQ, annual volume, release size, and inventory responsibility visible in the RFQ.<\/p>\n<p>Use this guide with the <a href=\"\/metal-stamping-quote-assumptions-checklist\/\">quote assumptions checklist<\/a>, <a href=\"\/low-volume-vs-high-volume-metal-stamping-cost\/\">low versus high volume cost guide<\/a>, <a href=\"\/metal-stamping-production-lead-time\/\">production lead time guide<\/a>, and <a href=\"\/metal-stamping-coil-yield-scrap-rate-calculation\/\">coil yield guide<\/a>.<\/p>\n<h2>MOQ questions that change the quote<\/h2>\n<table class=\"msp-content-table\">\n<thead>\n<tr>\n<th>Issue<\/th>\n<th>Why it changes price<\/th>\n<th>RFQ detail to provide<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Coil or sheet purchase<\/td>\n<td>Material may have mill, service center, or slit-coil minimums.<\/td>\n<td>State material grade, thickness, finish, annual usage, and whether substitutes are allowed.<\/td>\n<\/tr>\n<tr>\n<td>Setup and changeover<\/td>\n<td>Small releases can spend more time in setup than production.<\/td>\n<td>Separate annual volume from each release quantity.<\/td>\n<\/tr>\n<tr>\n<td>Inspection lot size<\/td>\n<td>First article, sampling, and packaging checks add fixed cost.<\/td>\n<td>Define required reports, AQL level, and lot traceability.<\/td>\n<\/tr>\n<tr>\n<td>Inventory holding<\/td>\n<td>Blanket orders shift risk depending on who holds stock.<\/td>\n<td>Clarify finished-goods stock, raw material stock, and cancellation terms.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>How blanket orders help<\/h2>\n<p>A blanket purchase order can let the supplier buy material more efficiently, run longer production lots, and reserve capacity. It can also help the buyer avoid repeated tooling setup charges and emergency freight. The benefit is real only if the forecast is credible and releases are not constantly changed.<\/p>\n<p>The blanket should define total annual quantity, release intervals, minimum ship quantity, pull-ahead rules, and whether the supplier may produce ahead. If the supplier is expected to hold finished goods, the quote should say how long inventory can sit before the buyer must accept it.<\/p>\n<h2>Where MOQ creates risk<\/h2>\n<p>MOQ becomes risky when the drawing is still changing. If the supplier buys material or builds finished stock before the design is frozen, obsolete inventory can become a dispute. Link blanket planning to the <a href=\"\/metal-stamping-engineering-change-control-guide\/\">engineering change control guide<\/a> and <a href=\"\/metal-stamping-tool-ownership-transfer-guide\/\">tool ownership transfer guide<\/a> when the project is not stable.<\/p>\n<p>MOQ also affects packaging. A minimum production lot may be 20,000 pieces, but the buyer may need cartons of 1,000 or reels of 5,000. If packing, labels, certificates, and lot splits are not defined, the supplier may quote a low unit price and later add handling cost.<\/p>\n<h2>RFQ details to include<\/h2>\n<ul>\n<li>2D drawing, material, thickness, finish, tolerance, and current revision status.<\/li>\n<li>Estimated annual volume, first order quantity, normal release quantity, and release frequency.<\/li>\n<li>Required price breaks, target MOQ, and whether blanket order pricing is acceptable.<\/li>\n<li>Raw material ownership, finished-goods stock rules, cancellation window, and obsolete inventory responsibility.<\/li>\n<li>Packaging quantity, label format, certificate requirements, and lot traceability needs.<\/li>\n<li>Forecast horizon, demand variability, safety stock target, and urgent shipment expectations.<\/li>\n<li>Target lead time for first samples, first production release, and repeat releases.<\/li>\n<\/ul>\n<h2>How to compare supplier answers<\/h2>\n<p>Ask each supplier to show whether the price assumes one release, multiple releases, or a full annual blanket. A low price with a large MOQ may be useful for a stable part, but it may be expensive for a part that still has pending validation. A higher price with smaller releases may be safer during early demand testing.<\/p>\n<p>For production controls, connect the order plan with the <a href=\"\/metal-stamping-control-plan-checklist\/\">control plan checklist<\/a>, <a href=\"\/stamped-part-lot-traceability-serialization\/\">lot traceability guide<\/a>, and <a href=\"\/stamped-part-packaging-damage-claim-prevention\/\">packaging damage prevention guide<\/a>. Send the drawing and forecast through the <a href=\"\/contact\/\">contact page<\/a>. If you need two quote versions, use the <a href=\"\/contact\/\">RFQ form<\/a> to request both single-release and blanket-order pricing.<\/p>\n<p>For supplier comparison, ask for the same price table from each source: sample lot, first production release, normal release, and annual blanket. This makes MOQ visible instead of hiding it inside a unit price. It also shows whether the supplier is trying to solve the real demand pattern or only quoting the easiest manufacturing batch.<\/p>\n<h2>FAQ<\/h2>\n<div itemscope itemtype=\"https:\/\/schema.org\/FAQPage\">\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What is MOQ in metal stamping?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">MOQ is the minimum order quantity needed to cover material purchase, setup, inspection, packaging, and handling cost for a stamped part.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">Is a blanket order always cheaper?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Not always. It can reduce unit cost for stable demand, but it can create obsolete inventory risk if the drawing or forecast changes.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">What release schedule should I send in an RFQ?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">Send annual demand, first order quantity, normal release quantity, release frequency, safety stock target, and any urgent delivery expectations.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div itemscope itemprop=\"mainEntity\" itemtype=\"https:\/\/schema.org\/Question\">\n<h3 itemprop=\"name\">Who owns inventory under a blanket order?<\/h3>\n<div itemscope itemprop=\"acceptedAnswer\" itemtype=\"https:\/\/schema.org\/Answer\">\n<p itemprop=\"text\">That must be agreed before purchase order release. The RFQ should state raw material, finished goods, cancellation, and obsolete inventory responsibility.<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is MOQ in metal stamping?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"MOQ is the minimum order quantity needed to cover material purchase, setup, inspection, packaging, and handling cost for a stamped part.\"}},{\"@type\":\"Question\",\"name\":\"Is a blanket order always cheaper?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not always. It can reduce unit cost for stable demand, but it can create obsolete inventory risk if the drawing or forecast changes.\"}},{\"@type\":\"Question\",\"name\":\"What release schedule should I send in an RFQ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Send annual demand, first order quantity, normal release quantity, release frequency, safety stock target, and any urgent delivery expectations.\"}},{\"@type\":\"Question\",\"name\":\"Who owns inventory under a blanket order?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"That must be agreed before purchase order release. The RFQ should state raw material, finished goods, cancellation, and obsolete inventory responsibility.\"}}]}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A buyer guide for MOQ, blanket purchase orders, release schedules, price breaks, safety stock, and inventory assumptions in metal stamping RFQs.<\/p>\n","protected":false},"author":1,"featured_media":1847,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-2222","page","type-page","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Metal Stamping MOQ and Blanket Order Guide<\/title>\n<meta name=\"description\" content=\"Plan metal stamping MOQ, blanket orders, release schedules, safety stock, price breaks, and inventory risk before sending an RFQ.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Metal Stamping MOQ and Blanket Order Guide\" \/>\n<meta property=\"og:description\" content=\"Plan metal stamping MOQ, blanket orders, release schedules, safety stock, price breaks, and inventory risk before sending an RFQ.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61579126831477\" \/>\n<meta property=\"og:image\" content=\"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/custom-stamping-parts-workflow-featured-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@duoshaomali\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/metal-stamping-moq-blanket-order-guide\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/metal-stamping-moq-blanket-order-guide\\\/\",\"name\":\"Metal Stamping MOQ and Blanket Order Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/metal-stamping-moq-blanket-order-guide\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/metal-stamping-moq-blanket-order-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/custom-stamping-parts-workflow-featured-1.webp\",\"datePublished\":\"2026-07-03T18:59:46+00:00\",\"description\":\"Plan metal stamping MOQ, blanket orders, release schedules, safety stock, price breaks, and inventory risk before sending an RFQ.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/metal-stamping-moq-blanket-order-guide\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/metalstampingparts.ltd\\\/metal-stamping-moq-blanket-order-guide\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/metal-stamping-moq-blanket-order-guide\\\/#primaryimage\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/custom-stamping-parts-workflow-featured-1.webp\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/custom-stamping-parts-workflow-featured-1.webp\",\"width\":800,\"height\":450,\"caption\":\"Custom metal stamping parts RFQ engineering drawing quotation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/metal-stamping-moq-blanket-order-guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Metal Stamping MOQ and Blanket Order Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#website\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\",\"description\":\"Custom Precision Metal Stamping &amp; Hardware Components\",\"publisher\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/metalstampingparts.ltd\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#organization\",\"name\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"contentUrl\":\"https:\\\/\\\/metalstampingparts.ltd\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/logo-compressed.jpg\",\"width\":200,\"height\":200,\"caption\":\"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping\"},\"image\":{\"@id\":\"https:\\\/\\\/metalstampingparts.ltd\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=61579126831477\",\"https:\\\/\\\/x.com\\\/duoshaomali\"],\"knowsAbout\":[\"Metal Stamping\",\"Progressive Die Stamping\",\"Deep Draw Stamping\",\"Sheet Metal Forming\",\"Stamping Die Design\",\"Precision Metal Parts Manufacturing\",\"Aluminum Stamping\",\"Stainless Steel Stamping\",\"Automotive Metal Components\",\"Aerospace Precision Parts\",\"CNC Tooling\",\"Quality Control and Inspection\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Metal Stamping MOQ and Blanket Order Guide","description":"Plan metal stamping MOQ, blanket orders, release schedules, safety stock, price breaks, and inventory risk before sending an RFQ.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/","og_locale":"en_US","og_type":"article","og_title":"Metal Stamping MOQ and Blanket Order Guide","og_description":"Plan metal stamping MOQ, blanket orders, release schedules, safety stock, price breaks, and inventory risk before sending an RFQ.","og_url":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/","og_site_name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61579126831477","og_image":[{"width":800,"height":450,"url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/custom-stamping-parts-workflow-featured-1.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_site":"@duoshaomali","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/","url":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/","name":"Metal Stamping MOQ and Blanket Order Guide","isPartOf":{"@id":"https:\/\/metalstampingparts.ltd\/#website"},"primaryImageOfPage":{"@id":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/#primaryimage"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/custom-stamping-parts-workflow-featured-1.webp","datePublished":"2026-07-03T18:59:46+00:00","description":"Plan metal stamping MOQ, blanket orders, release schedules, safety stock, price breaks, and inventory risk before sending an RFQ.","breadcrumb":{"@id":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/#primaryimage","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/custom-stamping-parts-workflow-featured-1.webp","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/04\/custom-stamping-parts-workflow-featured-1.webp","width":800,"height":450,"caption":"Custom metal stamping parts RFQ engineering drawing quotation"},{"@type":"BreadcrumbList","@id":"https:\/\/metalstampingparts.ltd\/metal-stamping-moq-blanket-order-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/metalstampingparts.ltd\/"},{"@type":"ListItem","position":2,"name":"Metal Stamping MOQ and Blanket Order Guide"}]},{"@type":"WebSite","@id":"https:\/\/metalstampingparts.ltd\/#website","url":"https:\/\/metalstampingparts.ltd\/","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","description":"Custom Precision Metal Stamping &amp; Hardware Components","publisher":{"@id":"https:\/\/metalstampingparts.ltd\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/metalstampingparts.ltd\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/metalstampingparts.ltd\/#organization","name":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping","url":"https:\/\/metalstampingparts.ltd\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/","url":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","contentUrl":"https:\/\/metalstampingparts.ltd\/wp-content\/uploads\/2026\/05\/logo-compressed.jpg","width":200,"height":200,"caption":"Dongguan Chenghui Intelligent Technology Co., Ltd. - Metal Stamping"},"image":{"@id":"https:\/\/metalstampingparts.ltd\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=61579126831477","https:\/\/x.com\/duoshaomali"],"knowsAbout":["Metal Stamping","Progressive Die Stamping","Deep Draw Stamping","Sheet Metal Forming","Stamping Die Design","Precision Metal Parts Manufacturing","Aluminum Stamping","Stainless Steel Stamping","Automotive Metal Components","Aerospace Precision Parts","CNC Tooling","Quality Control and Inspection"]}]}},"_links":{"self":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/comments?post=2222"}],"version-history":[{"count":1,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2222\/revisions"}],"predecessor-version":[{"id":2223,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/pages\/2222\/revisions\/2223"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/media\/1847"}],"wp:attachment":[{"href":"https:\/\/metalstampingparts.ltd\/wp-json\/wp\/v2\/media?parent=2222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}